A 1950s commercial building collapsed during building renovations, resulting in a million dollar lawsuit. EDT analyzed the renovation process and the actions of multiple parties to provide expert testimony in court.
EDT was asked to determine how long a plumbing leak had been in place as part of the evaluation of water-related damages to a residence.
A recent engineering consultation involved the evaluation of water-related damages to a residence. The Assignment EDT was asked to determine “how?” and “why?” this loss occurred.
A blackout occurred on August 14, 2003 that affected portions of the northeastern United States, including a hydroelectric generating facility, which itself lost electrical power.
EDT was asked to assess the roofing, equipment, and structural damage at a food processing facility and prepare repair, replacement, and/or reconstruction estimates.